PROJECT: Complete Apartment Rehab

 

 

Salem Street, Boston

OBJECTIVE:

  • Create an open floor plan.
  • Move Heating Unit & Gas meter to the Basement.
  • Apartment had the bathroom in the common area/hallway therefore we built a new bathroom inside the apartment for obvious reason.
  • Remove all the walls and Install insulation, drywall & plaster the entire Apartment.
  • Install new subfloor and hardwood floors throughout the entire Apartment.
  • Paint & Install all new trim, molding & baseboards to the entire Apartment.
  • Install new cabinetry and Granite Countertops to the kitchen along with a glass tile backsplash.
  • Install new basboard heating throughout the entire Apartment.
  • Install & Paint new doors throughout the entire Apartment.
  • Build new closets for bedrooms with lighting inside.
  • Installed new windows and aluminum window trim to match all the windows throughout the building.
  • Install new lighting and electrical wiring throughout the entire Apartment including Cable outputs to all the rooms.

A BEFORE View during Demo. You can see where the old entrance was and the old gas meter location as well.

An AFTER pic of similar View. The left door is the new bathroom location where the old gas meter used to be.

A BEFORE View during the framing of the kitchen cabinet wall and bedroom wall.

An AFTER View of the kitchen cabinets, new recessed lighting and the new bedroom adjacent to kitchen.

A view of the kitchen window we removed and installed a smaller window to accomodate the cabinetry.

An AFTER View of the new window, lighting cabinets, Granite countertop, appliances & floors.

A BEFORE View from the 2nd Bedroom. All the walls were removed at this point.

An AFTER View of the new window, lighting cabinets, Granite countertop, appliances & floors.