Project
PROJECT: Bathroom Make-Over
Weymouth, MA
OBJECTIVE:
- Remove the side of the jacuzzi tub and create a new access point to the motor in the room next door in order to tile the side of the tub and avoid having a visible door.
- Remove the floor tiles and shower tiles.
- Framing on the shower head side wall was rotted so it was reframed to make it structurally sound.
- Old plumbing was also rotted so new copper piping was installed.
- Tile the floor with new marble tiles.
- Tile the shower with ceramic tiles and a marble/glass mosaic accent matching the bathroom floors and sink.
- Frame the side of the jakuzzi and tile to match shower.
- Install a new shower door.
- Install new shower fixtures.
- Purchase an unfinished cabinet and finish with a mahogany stain/polyurethane and install hardware.
- Install a custom granite counter-top.
- Install a marble vessel sink matching the marble floors of the bathroom.
- Install vessel faucet.
- Install a new toilet and vent cover.
- Install 5″ baseboards throughout the entire bathroom.
- Paint the bathroom and install new mirror.
Old vanity, view one.
Old vanity, view two. Old floors ripped out and side of the jacuzzi is framed.
New unfinished Vanity purchased in two pieces.
Vanity being worked on in our shop.
Old tub area prior to starting.
Tub area tiled and ready for grouting.
Detail view of mosaic tiles ready for grouting.
Custom shelves detail view.
Shower tiles grouted and sealed. Shower fixtures installed.
Shower door installed. First stages of floor tiling.
Plumbing was moved to accommodate new vanity and vanity is ready for granite install.
Countertop installed as well as new sink and faucet.
Completed bathroom, view one.
Completed bathroom, view two.